Howrah Bridge: Construction of the Longest Cantilever ...
Single-span arch bridge: It was rejected on account of a high lateral thrust. Suspension bridge: It was rejected on account of longitudinal pull on anchorages. Pier and girder bridge: It was the most economical but was rejected due to likely change in the bathymetry of the river and the obstruction to river traffic.
Get Price